地理研究 ›› 1992, Vol. 11 ›› Issue (2): 17-25.doi: 10.11821/yj1992020003

• 论文 • 上一篇    下一篇

泥沙起动条件与卵石浅滩航道整治线宽度的确定

钟恩清   

  1. 中山大学地理系
  • 收稿日期:1991-04-04 修回日期:1992-01-20 出版日期:1992-06-15 发布日期:1992-06-15

INITIATION CONDITION OF SEDIMENT MOVEMENT AND DETERMINATION OF THE WIDTH OF NORMAL LINE OF NAVIGATION CHANNEL FOR PEBBLE SHOALS

Zhong Enqing   

  1. Department of Geography, Zhongshan University
  • Received:1991-04-04 Revised:1992-01-20 Online:1992-06-15 Published:1992-06-15

摘要: 在简述泥沙起动条件表达式的基础上,本文分析卵石浅滩整治与泥沙起动条件的关系。根据起动拖曳力和起动流速的概念,分别导出了卵石浅滩航道整治宽度计算公式,并用北江整治河段的实测资料对诸公式作了比较。结果表明,式(16)的计算值与实际采用值有较好的一致性。

关键词: 泥沙起动条件, 航道整治, 卵石浅滩, 整治线宽度

Abstract: So far the problem of determining the width of normal line for pebble shoals has not beeen completely solved.Inordect answerthe question. briefly describes the expressions of initiation condition of sediment movement. and further states the relationship between regulation of pebble shoal and initiation condition of sediment movement.Oa the basis of the concept of starting drag force the formula (15) and (16) for cilcalating the width of normal line to the gravel shoals are dsiuced by using the shield's formula and the Shields's curve and its modification,and then aeeding to the coacept of starting velo-city, we deduce the formula (19), (21), (21) and (22) respectively by use of the Zhang Ruijin's formila,the Tang Cunben's formila the Dou Guoren'sformula and the Sha Yuqing's formila.Finally,these formilas are compared by the measured data in the upper revenes of the Beijing River,The compirison results show that the calculated values of the formala (16) are in good agreement with the actual application values. It is expected that the formula can be served as a reference for channel regulations.

Key words: initiation condition of sediment movement, channel regulation, pebble shoal, width of normal line