地理研究 ›› 1999, Vol. 18 ›› Issue (2): 220-223.doi: 10.11821/yj1999020016

• 论文 • 上一篇    下一篇

流域沟壑密度理论极值数学模式商讨

蒋忠信   

  1. 铁道部第二勘测设计院
  • 收稿日期:1998-12-04 修回日期:1999-03-20 出版日期:1999-06-15 发布日期:1999-06-15
  • 作者简介:蒋忠信(1941- ),男,四川广安人,教授级高级工程师,铁道部第二勘测设计院岩土工程公司常务副经理兼总工程师。1965年毕业于北京大学地貌学专业,发表论文90多篇(第一作者),出版论著3部。

A discussion on the mathematical model of theoretical maximum of gully density

JIANG Zhongxin   

  1. The No2 Survey and Design Institute, Ministry of Railways, Chengdu 610031, China
  • Received:1998-12-04 Revised:1999-03-20 Online:1999-06-15 Published:1999-06-15

摘要: 对张丽萍等建立的流域沟壑密度理论极值圆形数学模式进行了更正。鉴于更正的模式又与实际相矛盾,又推导出更符合实际的正六边形数学模式。

关键词: 沟壑密度, 理论极值, 数学模式

Abstract: Zhang Liping's circular mathematical model of theoretical maximum of gully desity is corrected, and there is a larger difference between the corrected model and reality.Therefore, a regular hexagon mathematical model of theoretical maximum (D)of gully density is reckoned.The new model conforms more to the reality.

Key words: gully density, theoretical maximum, mathematical model

PACS: 

  • P931.1