中国对非洲承包工程时空演变过程与影响机制
|
刘志高, 薛嘉顺, 王涛, 宋涛
|
The spatio-temporal evolutionary process and mechanism of China's overseas contracted projects in Africa
|
LIU Zhigao, XUE Jiashun, WANG Tao, SONG Tao
|
|
表3 方差膨胀因子检验
|
Tab.3 Variance inflation factor test
|
|
变量 | VIF | 1/VIF | 变量 | VIF | 1/VIF | ln GDP | 3.78 | 0.264727 | CN | 1.55 | 0.646777 | ER | 2.71 | 0.369352 | LANDLOCK | 1.49 | 0.669967 | FTS | 2.68 | 0.373290 | BIT | 1.48 | 0.674542 | PA | 2.25 | 0.444537 | OPEN | 1.43 | 0.701606 | NRE | 2.22 | 0.450909 | UNION | 1.39 | 0.720941 | PS | 2.04 | 0.489784 | TR | 1.26 | 0.79186 | LFP | 1.95 | 0.511597 | BR | 1.25 | 0.802925 | EDS | 1.65 | 0.607244 | GDPG | 1.05 | 0.954957 | | | | Mean VIF | 1.89 | |
|
|
|