Influence of human activities on erosion, delivery and deposit of basin system in hilly-gully loessic area
Received date: 2000-06-10
Revised date: 2000-11-22
Online published: 2001-02-15
From long term point of view, sediment delivery ratio of a drainage basin with a control degree reaching 70% can be reduced by around 50% in contrast to pre control conditions. The effect of erosion control is quite significant. In the management process, although delivery ratio drops considerably in comparison to pre control conditions, yet the previous retained sediment can still be carried, resulting in the situation of delivery ratio greater than 1 since erosive strength of rainstorm induced erosion is greater than project designed standard in a short spell following dike breach and scouring. In the loess plateau region, individual rainstorm event related delivery ratio under either pre or post control conditions in drainge system can be obtained by using runoff depth, and dynamic mechanism for changes of delivery ratio can be explained with shear force changes following fluctuations of runoff depth.
CHEN Hao, CAI Qiang guo, CHEN Jin ron, JIN De sheng . Influence of human activities on erosion, delivery and deposit of basin system in hilly-gully loessic area[J]. GEOGRAPHICAL RESEARCH, 2001 , 20(1) : 68 -75 . DOI: 10.11821/yj2001010010
[1] 牟金泽,孟庆枚.论流域产沙量计算中的泥沙输移比
[J].泥沙研究(1),1982(2):223~230.
[2] 尹国康.流域地貌系统
[M].南京:南京大学出版社,1991.117~152.
[3] 陈永宗.黄土高原沟道流域产沙过程的初步研究
[J].地理研究,1988,2(1):35~46.
[4] 陆中臣.流域侵蚀产沙和物质转移
[J].地理研究,1989,8(2):101~111.
[5] 张胜利,李倬等.黄河中游多沙粗沙区水沙变化原因及发展趋势
[M].黄河水利出版社,1998.59~64.
[6] 陈浩.黄土丘陵沟壑区流域系统侵蚀与产沙关系
[J].地理学报,2000(3):354~364.
[7] 山西水保所.晋西离石王家沟流域综合治理与效益
[J].山西水土保持科技,1976(2):1~11.
[8] 徐雪良.韭园沟流域沟间地、沟谷地来水来沙量的研究
[J].中国水土保持,1987(8):23~26.
/
| 〈 |
|
〉 |